JG Vertical was engaged by The Foundry Liverpool to complete specialised facade enhancement and remedial works across the external precast structure. Using advanced rope access techniques, our team delivered efficient, non-invasive solutions to improve the building’s appearance, complete remedial detailing and provide long-term facade protection.

Scope of Work

Conducted facade inspections and project planning

Developed safe rope access methodologies for external works

Coordinated facade enhancement and remedial operations

Implemented non-invasive rope access systems to minimise disruption

Planned access and material application strategies across multiple elevations

Delivered facade rectification, painting and protective coating solutions

JG Completed the Following

Supplied and installed anchor points across the external structure.

Carried out minor concrete patching and facade preparation works.

Painted external window surrounds and facade detailing elements.

Applied ECOTONE Minsil protective colour finish to external precast surfaces via rope access.

Completed colour matching solutions to improve the appearance of exposed concrete facades.

Completed caulking of external brick facade components and precast joints.

Delivered all works safely and efficiently with minimal disruption to the surrounding environment.

Achieved a high-quality facade finish that enhanced the overall presentation of the development.